Managing Assets by Criticality
Although most reliability management processes are based on managing critical assets, many
organizations fail to fully understand the meaning behind the criticality ranking. Most reliability
specialists will tell you that the “critical” assets have the greatest impact on the plant mission, be
it production rate, quality of product produced, or cost per product produced. Operating under
this mindset, they often overlook the single characteristic that makes each asset “critical” in the
first place. Through proper construction of the criticality analysis model, reliability engineering
will be able to illustrate what reliability enhancements must be made to manage criticality, thus
improving their ability to manage assets by criticality.
What’s In the Number?
The first step in setting up a criticality analysis model is to define those characteristics that will
be used to analyze each maintainable asset. These characteristics should cover a wide range of
business attributes, such as:
Mission and customer impact
Safety and environmental impact
Ability to isolate single-point-failures
Preventive Maintenance (PM) history
Corrective Maintenance (CM) history
Mean-Time-Between-Failures (MTBF) or “Reliability”
Probability of failure
Spares lead time
Asset replacement value
Planned utilization rate
Each characteristic should then be weighted using a scale from 0 to 10 to identify significance to
the business. The greater the scale, the easier it will be to accurately identify “critical” assets;
however, the total score possible should not exceed 100. By setting a limit of 100, you are reenforcing
the “weight” of each characteristic.
What Can Be Learned From The Number?
This is the point were most reliability management processes go wrong. Many models in use
today will set a criticality ranking based on a scoring range. For example, an asset which scores
between 75 and 100 may be considered “critical”, while an asset that scores less than 25 may be“expendable”. This practice undermines the entire concept of a criticality analysis. The
organization might as well give each asset a number from 1 to 5 and call all things equal. This
grouping of scores provides no meaningful data for establishing an asset management program,
nor does it delineate between “critical” assets to illustrate which assets are regulatory controlled,
mission critical, or simply unreliable.
We need to recognize that all assets are not created equal. We also need to remember that the
model we are trying to implement is an “analysis”, which by definition means to scrutinize or
examine the data collected to gain knowledge for the purpose of making decisions. The results
of our analysis should not only identify those assets that are within the top 20%, but should also
indicate the leading characteristic that makes each asset critical.
Table 1
Asset |
Description |
Mission Impact |
Customer Impact |
Safety Impact |
Environmental Impact |
Regulatory Impact |
Single Point Failure |
PM / PdM History |
CM History |
Reliability |
Spares Lead Time |
Asset Replacement Value |
Planned Utilization |
Criticality Rating |
P012 |
No. 12 Cooling Water Pump |
5 |
1 |
1 |
0 |
2 |
7 |
1 |
2 |
2 |
6 |
3 |
10 |
80 |
Using the Table 1 example, we can deduce that the “No. 12 Cooling Water Pump” is a critical
asset as it falls within the top 20% guidelines, but the score of 80 alone tells us nothing about
how to manage this “critical” asset. Through further analysis we are able to conclude that by
reducing the consequences associated with a single-point-failure, through Single Minute
Exchange of Die (SMED), ready service spares, or properly managed critical spares inventory,
we can lower the criticality ranking, allowing the reliability group to focus their efforts on the
truly unreliable.
Managing Assets by Criticality
Once we understand the meaning behind the number, the criticality analysis model becomes a
tool used to develop the asset management program. For those assets that are within the top
20%, reliability specialists will typically proceed with a Failure Modes Effects Analysis (FMEA)
to assess the risk priority associated with each type of failure and to determine the appropriate
corrective actions. But we again must consider the critical characteristics that are common
throughout the organization, across all assets, critical or not. In doing so, asset management
becomes a plant wide process. If “Mission Impact” is commonly critical, then the organization
may need to considered equipment redundancy plans. For those organizations that find “Spares
Lead Time” particularly critical, a materials management improvement program should be
initiated. And within those organizations that struggle to manage the cost of “Corrective
Maintenance History”, a formalized Preventive/Predictive Maintenance program should be
implemented.
Ranking Index for Maintenance Expenditures (RIME)
Asset criticality also provides us with a method to manage assets through work prioritization.
The method of ranking maintenance expenditures is based on an index that combines both the “work classification” ranking and “asset criticality” ranking, to produce a single “RIME” number
that is then used by Planners, Schedulers, and Materials Management to prioritize the weekly
workload.
|